Helpdesk Software
open search
open search Mobile Navigation

£16m pool shaped by Barnshaws will make a splash at South Shields seafront

South Shields Seafront Pool

Planning chiefs in South Tyneside have given the green light to a £16m project.

It will see a prime spot on the South Shields seafront turned into a leisure center complete with 25m swimming pool, learner pool, fitness suite and sauna, cafe and exhibition space.

Barnshaws Metal Bending was heavily involved in the project by bending numerous materials to various radii. Barnshaws Cosely branch provided angle bending, channel bending, column bending and beam bending services for this project:

  • 100 x 75 x 12.0 RSA Angle
  • 125 x 65 x 15 PFC Channel
  • 152 x 152 x 23 UC Column
  • RHS Y-Y up to 400 x 200 x 10.0 RHS
  • Beam Y-Y up to 203 x 133 x 30 UB
  • SHS up to 200 x 200 x 10.0 SHS

The project administered by LA Architects Limited is due for completion in spring 2013.

Leader of South Tyneside Council, Councillor Iain Malcolm, said: “We have a beautiful coastline and it is our job to maximise potential of this fantastic natural asset. The pool forms a key part of our regeneration plans for the South Shields foreshore and will provide us with a first-class indoor leisure facility, which means we can attract local people and visitors whatever the weather.”

More information can be found on the Graham website.

Zurück zu Neuigkeiten

Barnshaws Garantie

Die Barnshaws-Garantie ist eine Matrix von Vorteilen, die zusammen das bilden, was wir für ein beispielloses Kundensicherungspaket halten. Schauen Sie sich unsere Garantie an

Schauen Sie sich unsere Garantie an
CE Logo Oil & Gas UK Logo British Constructional Steelwork Association Logo Steel Construction Institute Logo Council for Aluminium in Building Logo Steel For Life Logo

Haftungsausschluss | Cookie-Erklärung | Cookie-Politik | Firmenregistrierung | Seitenübersicht